Use "back" arrow on browser to return to previous screen. |
|
Back to Alternator FAQ Index |
|
To ZENA Web Site Map |
Many variables affect installation time -- type of engine, the skill and/or the experience of the installer, space available, method of installation, wheither or not accessories/add-ons are also installed, and if parts will have to be fabricated.
The table below shows some typical times/costs (including bracket fabrication, where needed) for professionally done, first-time, alternator-only installations.
Type of |
Do-it-Yourself |
Professional |
Cost of Pro |
Large Tractor |
6 hours |
3 hours |
US$175.00 |
Small Tractor |
8 hours |
4 hours |
US$200.00 |
Farm Truck |
8 hours |
4 hours |
US$200.00 |
Small Service Truck |
9 hours |
4.5 hours |
US$240.00 |
Large Service Truck |
8 hours |
4 hours |
US$200.00 |
Lawn Tractor |
6 hours |
3 hours |
US$175.00 |
* NOTE:
Often value added resellers include the price of installation in their selling price.
Most of our commercial clients have skilled maintenance personnel who are well able to perform the simple tasks involved. However, we recommend that do-it-yourself installation should only be attempted by individuals who are both skilled in the use of power tools and who are familiar with the electrical and mechanical systems of the vehicle in which the welding system is to be installed.
One of the best ways to make this decision is to look at the many installation photos in our web site pages and in our printed installation materials (available to you free of charge in printed form or as downloadable Adobe Acrobat .pdf files --> go here to order/download these materials)